Nov 25, 2020
An orange gas gauge means that the line is pending. A blue gas gauge means that the line has been accepted and is not pending.
A pending line means that a line with holding cover subjectivities and/or line conditions has not been satisfied. A line with a no cover given subjectivity will not appear in the gas gauge until the subjectivity is satisfied. Once all lines are confirmed and the gas gauge is blue, the contract can be signed.
To satisfy subjectivities or accept pending lines, go to the Written Lines section of the contract and select Manage Lines.